New Build

A THRIVING SCHOOL, ENTERING A NEW ERA
Bramhall High School is a welcoming, high-achieving and fully comprehensive community where 1,350 students aged 11–16 learn, grow and thrive. We are proud to serve a wonderfully diverse cohort, and we take the time to ensure every young person is truly known, genuinely valued and supported to become the very best version of themselves.
|
A Once-in-a-Generation Transformation We are entering an incredibly exciting chapter in Bramhall High School’s story. Our new school building represents a once-in-a-generation investment — a bold, future-focused commitment to the young people and families we serve. This project isn’t about changing who we are; it’s about giving our students the very best environment in which to flourish. This project is not a change in direction. It is an investment in our future. The new building strengthens everything that already makes Bramhall special: our strong academic outcomes, our exceptional pastoral care, our rich extra-curricular life and our unwavering values of Respect, Resilience and Excellence. It is a natural next step for a school that is already thriving. |
|
Why We Need a New Building Our current buildings date back to the late 1960's and have simply reached the end of their design life. While temporary repairs have kept us going, a full rebuild is the safest, most sustainable and most forward-thinking solution. The new school will provide modern, flexible and energy-efficient spaces that truly reflect the needs of today’s learners — and tomorrows. |
|
What Will Stay the Same Although the building is changing, our identity is not.
|
The project enhances our provision — it doesn’t replace it.
A School Designed for Inspiration

The new three-storey building has been carefully crafted to create a vibrant, uplifting environment where students feel inspired to learn and proud to belong. It includes:
- Bright, modern classrooms
- Ten state-of-the-art science labs
- Specialist spaces for drama, music, art and design
The new school includes:
|
|
Every detail has been designed to support exceptional learning, creativity and wellbeing.
A Sustainable, Future-Ready School
Sustainability sits at the heart of the design.

The new building will feature:
|
|
This is a school built with the future in mind — environmentally responsible, energy-efficient and designed to encourage active travel.
A School for the Whole Community
Bramhall High School has always been a place where community matters, and the new build strengthens that connection. The sports hall, activity studio, drama spaces and MUGA will all be available for community use through a dedicated entrance, ensuring the main school remains secure while welcoming local groups and organisations.
The community MUGA has been carefully positioned to minimise noise and light impact, and any future lighting proposals for the 3G pitch will be subject to planning controls.

Continuing Our Tradition of Excellence
We approach this project from a position of real strength. Bramhall High School is a thriving, oversubscribed school with a ‘Good’ Ofsted rating, outstanding academic outcomes and full specialist staffing. Our students benefit from a rich and varied extra-curricular offer — from performing arts and competitive sport to STEM clubs, leadership opportunities and community partnerships.
The rebuild allows us to build on these strengths, expand our offer and ensure that Bramhall High School continues to be a place where every young person can thrive.
Supporting Every Learner
We are proud of our deeply embedded culture of care, and the new building strengthens this even further. Our dedicated SEND/Thrive/Transition hub will offer calm, purpose-built spaces with excellent acoustic control and its own entrance — a significant improvement on our current provision.
Alongside this, the new building includes a dedicated area for mental health and wellbeing, ensuring support is visible, accessible and woven into daily school life.

Travel, Parking and Access
A new School Travel Plan will encourage safe, active and sustainable travel for everyone in our community.


The new site will include:
|
|
Timeline and Next Steps
|
Construction |
| Autumn 2026 - Summer 2028 |

|
Demolition |
| Summer 2028 - Spring 2029 |

|
Landscaping |
| Completed Summer 2029 |

The project has been carefully phased to minimise disruption. Our experienced contractors will manage the site sensitively, with deliveries planned to avoid peak times and temporary arrangements in place to support students, staff and neighbours.

Looking Ahead with Confidence
This new building is more than bricks and mortar — it is a powerful statement about the kind of school we are and the ambitions we hold for our students. It reflects our belief that every young person deserves the very best: inspiring spaces, exceptional teaching and a community that knows and values them.
Bramhall High School is already a place where students thrive. This project ensures we remain that place for generations to come.
HAVE YOUR SAY

|
You can send your comments either online through the consultation website |
We would like to hear from you about the proposals.All comments received will be treated as strictly confidential and used only for the purpose of analysis and to provide a summary of comments to present to the Council. All contact information received will be kept private and deleted upon completion of the planning application process. Willmott Dixon, working with Bramhall High School and the Department for Education, intends to make its planning application shortly in mid-April. You will have the opportunity to make further comment directly to the Council at this time. |






